Behind-the-fence generation.

When the grid cannot connect you on your timeline, the only remaining variable is how fast you can build your own supply.

Where this usually goes wrong

Large-load connection queues in Alberta and ERCOT are longer than most project schedules and, in Alberta's case, capped. Developers holding signed tenants cannot wait for an allocation that may not come, and the self-supply route they turn to is usually sized against nameplate load rather than the actual profile.

How we scope it

We size the plant to your load profile and specify the generation against it, then source and verify the machine. The refurbishment scope, the balance of plant and the integration are written as specifications and performed by the contractors engaged for the project. Where a non-exporting configuration changes your regulatory position, that is scoped with counsel before you commit.

Performed by a named contractor

Load sizing, sourcing, verification and the procurement sequence are performed by PowerGen. Civil, electrical, integration and commissioning are performed by the contractors engaged for the project, each named in the transaction file before you commit.

What we require before we recommend a contractor

A promise is worth what the specification behind it is worth. These are the positions we will not sign without.

  • Prior work on a non-exporting configuration at comparable capacity, not a grid-tied analogue.
  • A single schedule covering the machine and the long-lead balance of plant, sequenced rather than listed.
  • An emissions basis tested against the local permit path before signature, not after.
  • Redundancy stated as a configuration, with the failure case written down.
  • Acceptance criteria and test reports released to the owner, not summarised.
Typical positions
ConfigurationNon-exporting, behind the meter
TechnologyAeroderivative or reciprocating, selected on duty cycle
FuelPipeline gas, dual fuel where backup is required
RedundancyN+1 typical for continuous industrial load
Emissions basisScoped against the local permit path before commitment
Schedule driverVerification, then long-lead balance of plant

Typical positions, not a specification. Every project is scoped against its own duty cycle, permit path and site.